Widows Creek 8 - 2008
[< Previous] [Next >]
of 3
WC8-2008-01.jpg
B-line generator with upper half end shields removed
WC8-2008-02.jpg
Removing A-Line slip ring base plate
WC8-2008-03.jpg
Generator crew job briefing at shift start
WC8-2008-04.jpg
Installing mule
WC8-2008-05.jpg
Installing second half of mule
WC8-2008-06.jpg
NDE of rotor supported on mule
WC8-2008-07.jpg
DE lower end shield removed
WC8-2008-08.jpg
Rolling out A-Line NDE lower end shield
WC8-2008-09.jpg
Still rolling...
WC8-2008-10.jpg
Side view
WC8-2008-11.jpg
Almost there...
WC8-2008-12.jpg
Ready for lifting it off
WC8-2008-13.jpg
Rick, Bill and Brion overseeing the work
WC8-2008-14.jpg
B-Line Generator
WC8-2008-15.jpg
Removing B-Line outer diffuser upper half
WC8-2008-16.jpg
B-Line NDE winding head exposed
WC8-2008-17.jpg
Cleaning inside B-Line DE generator
WC8-2008-18.jpg
Preparing A-Line bushing to be lowered for o-ring and CT's exchange
WC8-2008-19.jpg
B-Line generator waiting for the lower end shields to come back
WC8-2008-20.jpg
A-Line generator rotor supported on mule waiting for end shields to come back
WC8-2008-21.jpg
One of the end shields back from the shop
WC8-2008-22.jpg
Old CT assembly removed
WC8-2008-23.jpg
Sergio replacing o-rings on bushings
WC8-2008-24.jpg
Flanges on bushings where o-rings are replaced
WC8-2008-25.jpg
Terry watching the boiler feed pump turbine work