Batesville 2
Batesville, Mississippi
[< Previous] [Next >]
of 3
Batesville021.jpg
Rotor is in!
Batesville022.jpg
Looking out to the parking lot while hiding in the office building during a tornado warning
Batesville023.jpg
Water inside the turbine generator building
Batesville024.jpg
Lots of water collecting on the roof tarp
Batesville025.jpg
View from above after the thunderstorm
Batesville026.jpg
Setting up lower bearing end shield
Batesville027.jpg
Corner of stator
Batesville028.jpg
Clamping bearing into lower end shield to glue Teflon insulation on
Batesville029.jpg
Clamping bearing into lower end shield to glue Teflon insulation on
Batesville030.jpg
Side view of bearing clamping
Batesville031.jpg
Covered lower end shield with plastic to apply heat with Kerosene burner to speed up epoxy curing
Batesville032.jpg
Cleaning out stator
Batesville033.jpg
Removing the lower end shield from the temporary setup
Batesville034.jpg
NDE lower end shield to be installed
Batesville035.jpg
NDE lower end shield to be installed
Batesville036.jpg
NDE lower end shield and exciter installed
Batesville037.jpg
Flying in parts at night
Batesville038.jpg
DE diffuser and bearing cover installed
Batesville039.jpg
NDE diffuser installed
Batesville040.jpg
NDE bearing cover installed