Batesville 2
Batesville, Mississippi
Index 1
Index 2
Index 3
of 3
Generator waiting for rotor to come back
Unloading tool trailer
Setting up big mobile crane for rotor lift
Rotor arrived on site
Removing the roof and supports
Unpacking the rotor
Removing the rust protecttion from the journals
Adjusting the DE slide shoe
Rotor ready to be picked
Rotor in the air
Rotor in the air
Rotor slowly being lowered into the building
Tight spot
Slide tracks in stator bore
Still tight
Slowly getting there
View from the DE
Rotor slowly going in
Rotor supported on the NDE
Rotor being pulled on the DE